CBWP—->News Out Now




———”"CBWP”" IS–EXPLODING———

—–>>>NEWS is OUT Look Below!

Crownbutte Wind Power Promotes Dr. Terry Pilling to Executive Vice President

—-> MANDAN, N.D., Feb. 24 – Crownbutte Wind Power, Inc. (CBWP) has promoted Dr. Terry Pilling from Director of Operations to Executive Vice President. Dr. Pilling, who joined Crownbutte in 2008, is a former professor of physics at North Dakota State University, where he taught physics and engineering physics since 2004, after completing his post-doctoral research at the Joint Institute for Nuclear Research in Russia.

Dr. Pilling is responsible for project engineering, construction and operations. He has been a member of the Crownbutte board of directors since early 2009 and has started a research and technology division of Crownbutte, which has developed Crownbutte’s data analysis software and is now researching wind energy storage technologies.

Dr. Pilling commented, “I am truly happy that Crownbutte is becoming an electricity producer in the rapidly growing renewable energy industry and to be a part of the Crownbutte management team. The company is strongly positioned to take advantage of the nationwide push for renewable energy, in that all of our projects are located in prime wind locations as our meteorological data from those locations shows. Once they are constructed, the cash flow from these projects should help the company develop energy storage technologies, which we believe will enhance the project returns and make wind power generation a more stable and reliable component of the national power grid. This is a very exciting time to be in the wind power business.”

Crownbutte CEO Timothy Simons stated that, “Dr. Pilling was an asset to the company when he joined us in 2008 and has since become absolutely indispensable. He has acquired a deep knowledge of all aspects of the business from meteorology, grid interconnection and permitting all the way to project finance.”

About Crownbutte Wind Power, Inc. Â

Established in 1999, Crownbutte Wind Power, Inc., (www.crownbutte.com) is a North Dakota based developer of merchant wind power parks, with a current pipeline of over 640 MW of projects in various stages of development across North Dakota, South Dakota and Montana.

Crownbutte has strategically sized these projects to fit into the existing power grid so as to require only minimal transmission system upgrades, and therefore expects to be able to begin construction and operation much sooner than would be the case for larger projects requiring new transmission.

Take a look at one of the recent news releases where we Discover that out of 150 Solar Companies only two of them were fast Tracked by the Midwest ISO for Development and Implementation of their Project.

“The Midwest Independent Transmission System Operator is an essential link in the safe, cost-effective delivery of electric power across much of North America. The Midwest ISO is committed to reliability, the nondiscriminatory operation of the bulk power transmission system, and to working with all stakeholders to create cost-effective and innovative solutions for our changing industry. “

Solar Wind Deal trading Cheap under $1.00 is getting over $12,000,000.00 in projected revenue. This tiny unknown company could possibly change an investors entire portfolio around with the potential for a massive and Rapid Run up being that the news is so powerful and the price is so cheap.

From these trading levels a simple jump to just over $1.00 could yield close to a 100% gain very very quickly for the smart money that knows how to trade right.

Crownbutte Wind Power Well Positioned in 2010

On Monday February 22, 2010, 7:01 pm

MANDAN, N.D., Feb. 22- The management team of Crownbutte Wind Power, Inc. (CBWP – News) has navigated the complex energy environment to put the company in a strong position in 2010. “Our strategy is being recognized by market participants, and we believe 2010 will be a transitional year for us,” said CEO Tim Simons. With the expiration this year of the American Recovery and Reinvestment Act (ARRA), there are only a few projects in the North Dakota-Montana region that are positioned to take advantage of this government program, which offers a 30% cash grant for projects that begin construction before year end. The larger, 100 MW and up, projects, which a number of other wind companies are planning, have proven problematic because of the restrictions on current electrical transmission capacity throughout the power grid. We believe Crownbutte’s strategy of smaller, diversified projects scattered throughout the grid is more realistic and practical.

Transmission access and grid capacity are key to project development in today’s marketplace. Crownbutte’s strategy incorporates both transmission access and merchant market off-take. Â Three out of five of the wind parks in our portfolio are currently approved for transmission interconnection or have been in the transmission interconnection queue for some time.

CBWP has one facility ready for construction, and two more have been fast tracked through the interconnection queue and will be ready for construction by year end or sooner, as the final permitting and facility studies have been completed. Management believes these factors add value to the company’s portfolio of locations. The Company forecasts revenues of these three projects together will be nearly $12,000,000 per year.  Transmission access has become the major factor in attracting project financing for wind parks; all of our locations are based around spots with available power transmission capacity. Crownbutte is currently reviewing a number of financing alternatives and negotiating with a number of potential financing partners for our Gascoyne I, Elgin, and Wibaux projects. We believe our strategy to get three wind parks under construction by the end of 2010 is realistic, and our efforts to secure $120,000,000 in project financing are well under way.Â

Crownbutte’s pipeline of future projects scheduled for 2011 and beyond continues to be developed from initial stages of land acquisition. Currently, we have over 40,000 acres of land controlled in prime locations for wind in North Dakota and Montana, and we have several years of meteorological wind speed data gathered from our proprietary meteorological towers on each project site.  It has taken many years to develop this pipeline, because individual projects have been timed to ensure that their development is completed and that projects will become queued for transmission interconnection at the same time planned future improvements to the national power grid are completed.

Crownbutte intends to provide updates as the financing negotiations continue and terms are agreed upon. Similar to the telecom market’s deregulation, we believe the deregulation of the energy industry affords opportunities to capitalize on changes in the energy market. Wind energy is a cost-effective and environmentally friendly way to meet the increasing demand of the U.S. market. Creating electrons for consumers with a clean, renewable energy source, without dependence on unstable energy suppliers, is what drives Crownbutte’s business.

About Crownbutte Wind Power, Inc. Â

Established in 1999, Crownbutte Wind Power, Inc. (www.crownbutte.com) is a North Dakota based developer of merchant wind power parks, with a current pipeline of over 640 MW of projects in various stages of development across North Dakota, South Dakota and Montana.

Crownbutte has strategically sized these projects to fit into the existing power grid so as to require only minimal transmission system upgrades, and therefore expects to be able to begin construction and operation much sooner than would be the case for larger projects requiring new transmission.

Contact Us

Crownbutte Wind Power

111 5th Ave NE

Mandan, ND 58554

Office: 701-667-2073

Fax: 701-667-2083

A full Disclaimer is Available on our website “HERE”> >
Fortune500Stocks and partnered web entities may receive compensation form time to time for the profiling of information on public companies. Fortune500Stocks is negotiating being compensated ten thousand US Dollars for the generation of profiling of CBWP.

This email was sent to Subscriber.
To ensure that you continue receiving our emails, please add us to your address book or safe list. View this email on the web
here.
You can also forward to a friend.

Unsubscribe

Powered by Mad Mimi®