VGPR, The chart on VGPR shows us big upside, THIS PICK IS READY TO EXPLODE
|
Hi Subscriber,
VGPR, The chart on VGPR shows us big upside, THIS PICK IS READY TO EXPLODE GET IN ON A ROCKET RIDE FOR JUST .022. The last run on VGPR saw the stock move from .0014 to .039. This was a move of 2687%. There has been a consolidation in the .02 to .025 range and we think strong VGPR news could set off another massive rally. We spoke to VGPR today and they tell us that news is pending. WE THINK MEMBERS NEED TO BUCKLE IN HERE FOR A MOVE TO .10. NOW IS THE TIME TO PICK UP SOME CHEAP VGPR SHARES. www.stockta.com shows us that the last resistance point on VGPR is .04. During the last run, we got as high as .039. The .039 is also the 52 week high. The chart for VGPR also tells us that support is @ .02. We bounced off that support today and we think it signals a move higher. IF WE GET A CLOSE OF .04 OR IT WILL BE A NEW 52 WEEK HIGH AND ANOTHER BUY SIGNAL. VGPR IS EXECUTING ON THEIR MAIN PROJECT. UPDATES ON THIS DEAL AND OTHERS COULD CAUSE VGPR TO RUN HARD. Vega Chooses ARE Energy to Provide Generators for Its "Green Valley Project" 2009-11-16 17:15 ET – News Release LONDON — (MARKET WIRE) — 11/16/09 VEGA PROMOTIONAL SYSTEMS, INC. (PINKSHEETS: VGPR) today announced the Company has narrowed its search for power producing generators for its "Green Valley Project" to ARE Energy. The "Green Valley Project" is a multifaceted green energy power production facility that converts inexpensive methane gas from an abandoned coal mine into electricity and thermal energy. During the recent three year demonstration project, three generator sets were installed onsite in order to prove the viability of utilizing coal bed methane from the Green Valley mine as a sole source of fuel to generate electricity. Prior to Vega becoming involved in the project, the three generators were returned to the manufacturer. Vega recently announced the addition of Robert Chew to oversee the redesign of the Green Valley Project. One change that will be made is that the power generating capacity of the facility will be increased by 100% to generate approximately 5 megawatts of power. Mr. Chew has narrowed the search for replacement generators to ARE Energy, a division of American Railroad Equipment. The two companies are currently designing two generator sets for the project that would produce 5 megawatts of power. Once operational, the power will be sold to the local power company. Vega will provide additional details in the next few days concerning the delivery and set up of the generator sets. View this release in video format: http://www.vodnewswire.com/vodnewswire/news/vegapromosystems-20091116/ CONTACT:
|
|
|
|
|
|
|
|
Share this message with others: del.icio.us Digg StumbleUpon |

